Site-specific RAMS and Construction Phase Plans.
Planned and reviewed with your project requirements.
Seven-day free trial · credit card required · Full terms.
Turn 100 pages of pre-construction information into one clear plan.
Understand what the project requires of you before you start.
- Upload the pre-construction information, the construction phase plan, the drawings and the specification.
- Our system reads them and identifies what the project requires of you.
- Everything you create or review afterwards is worked against that same set of requirements.
- So you know what your obligations are, and you can prove it to the client.
- Asset protection permit required before any excavation within 3 m of the gas main.Page 14
- 11 kV overhead line crosses plots 18 to 22.Page 9
- The footway stays open to the public for the duration of the works.Page 22
- Site induction must cover the client's traffic management plan.Page 31
Plan site-specific RAMS and CPPs from what the project requires.
- Every job starts with an assessment of the hazards that task brings.
- The project's requirements are then worked through it clause by clause, so the plan fits this site, this crew and this plant.
- Every change is highlighted and referenced back to the project pack.
- Anything missing is left as a question so you know where the gaps are.
4.2 Excavation and support
The connection trench is dug by 3t excavator to invert, 1.4 m below existing surface, working back from the manhole toward plot 18.
Sides are supported by proprietary trench box from 1.2 m, set from outside the excavation. No operative enters an unsupported trench at any depth.
Asset protection permit before any excavation within 3 m of the main.
Page 14Made ground recorded across plots 14 to 22.
Page 9The footway stays open to the public throughout.
Page 22Check every RAMS against the project it's written for.
- Check your own document, your team's or one from your supply chain.
- Every document is read against that project's requirements, not against a generic checklist.
- Findings come back cited, highlighted and explained. The gaps are caught before somebody spends half a day finding them.
- Findings say whether a passage is missing, weak or in conflict with a requirement.
- Run second-line assurance on every safe system of work in your organisation.
6.3 Personal protective equipment. All operatives shall wear hi-vis, safety footwear and helmet within the working area.
Operatives cutting kerbs shall wear disposable FFP2 masks and eye protection. Water suppression to be used where practicable.
6.4 Emergency arrangements. In the event of an incident the supervisor will contact the site office.
6.5 Hand-arm vibration. Cut-off saw use is limited to two hours per operative per shift.
Cutting kerb generates respirable crystalline silica. FFP2 has an assigned protection factor of 10; this task needs 20. And “where practicable” leaves the water to the operative on the day.
Contacting the site office is not an emergency arrangement. No first aider, no rescue, and nothing that tells an ambulance about the footway closure it has to come through.
Looked for health surveillance for hand-arm vibration.
Read 14 pages while looking.
Responsible AI.
We keep our AI transparent and accountable.
Marked, not hidden.
We do not hand you a finished document and ask you to trust it. Every change is highlighted and referenced back to the project pack, and you can edit any of it.
If it isn't cited, it's not used.
Any recommendation our AI makes is cited to a source. If it can't find a source, it doesn't make the recommendation.
Grounded in the published guidance.
The library every plan is built from is grounded in 52 HSE publications and approved codes of practice. Reviews are checked against your project's requirements.
“The RAMS from our previous provider got us kicked off site. Ramsgen got us back on.”
Comcare Heating Solutions
Plans for every tier contractor.
Site-specific RAMS for one person.
- Site-specific RAMS
- Project requirements extraction
- 10 documents a month
RAMS and construction phase plans for two people.
- Everything in Standard
- Construction phase plans
- Custom templates
- 20 documents a month
Writing and review for a team of five.
- Everything in Professional
- RAMS review
- 50 documents a month
Larger companies can be billed by active project instead of by user. Request a callback.
Seven-day free trial · credit card required · Full terms.