RAMS software for site-specific RAMS and construction phase plans.

Create and review site-specific RAMS, CPPs, COSHH and vibration assessments directly from the project requirements.

A site-specific electrical installation RAMS made with Ramsgen: the cover page and introduction
HazardsRiverside House office fit-out

Hazards recommended for this task and site.

Hazard and reasonRisk before controls

Recommended for this job

  • Electric shock from the circuit worked on

    Final connections are made to the second-floor lighting and small power circuits.

    From: Method

    Before 15 High
  • Live parts beside the work

    Adjacent circuits in shared enclosures stay live during the works.

    From: Site

    Before 15 High
  • Striking hidden cables or pipes

    Northbank's permit to drill applies before fixing into the structure.

    From: Documents

    Before 12 Medium
A site-specific electrical installation RAMS made with Ramsgen.
“The RAMS from our previous provider got us kicked off site. Ramsgen got us back on.”

Comcare Heating Solutions

CECA Wales

Turn 100 pages of pre-construction information into one clear plan.

Step one

Project requirements

Know what the project requires of you before you start.

  • Upload the pre-construction information, the drawings and the specification. Ramsgen lists the permits, site rules, services and restrictions, each cited to its page.
  • Every RAMS you write or review is worked against that list, so you can show the client how each requirement is met.
How project requirements are handled
Pre-construction informationFoundry Lane
  • Asset protection permit required before any excavation within 3 m of the gas main.Page 14
  • 11 kV overhead line crosses plots 18 to 22.Page 9
  • The footway stays open to the public for the duration of the works.Page 22
  • Site induction must cover the client's traffic management plan.Page 31
Step two

RAMS generator

Site-specific RAMS drafted from the project requirements.

  • Ramsgen recommends the hazards for the site and the method, each with the reason it applies, and drafts the RAMS from your answers.
  • Every line can be edited, and lines written to meet a requirement are linked to it.
How a site-specific RAMS is planned
HazardsDrainage, Foundry Lane

Hazards recommended for this task and site.

Hazard and reasonRisk before controls

Recommended for this job

  • Collapse of excavation

    The trench is dug to 1.4 m through made ground.

    From: Method

    Before 15 High
  • Strike on the gas main

    An asset protection permit is needed within 3 m of the main.

    From: Documents

    Before 10 Medium
  • Members of the public

    The footway stays open to the public throughout.

    From: Documents

    Before 9 Medium
  • Hand-arm vibration

    The existing surface is broken out by breaker and cut-off saw.

    From: Method

    Before 12 Medium
Step three

RAMS review

Check every RAMS against the project it's written for.

  • Review your own RAMS or your supply chain's against the project's requirements and 165 review questions.
  • Each finding is highlighted on the passage it concerns, marked missing, weak or in conflict with a requirement, and cited to the page.
How a RAMS review works
MS-2214 Kerbing, rev CPage 11

6.3 Personal protective equipment. All operatives shall wear hi-vis, safety footwear and helmet within the working area.

Operatives cutting kerbs shall wear disposable FFP2 masks and eye protection. Water suppression to be used where practicable.

6.4 Emergency arrangements. In the event of an incident the supervisor will contact the site office.

6.5 Hand-arm vibration. Cut-off saw use is limited to two hours per operative per shift.

MajorWeakpage 11

Cutting kerb generates respirable crystalline silica. FFP2 has an assigned protection factor of 10; this task needs 20. “Where practicable” leaves water suppression to the operative’s discretion.

MajorMissingpage 11

Contacting the site office is not an emergency arrangement. The clause names no first aider, no rescue arrangement and no ambulance route past the footway closure.

Not found

Health surveillance for hand-arm vibration.

Not found in 14 pages.

Also in Ramsgen.

From Standard at £59 a month.

RAMS templates by trade, from electrical and plumbing to scaffolding and roofing. New to RAMS? Read What are RAMS?.

Responsible AI.

We keep our AI transparent and accountable.

The document

Marked, not hidden.

We do not hand you a finished document and ask you to trust it. Every change is highlighted and referenced back to the project pack, and you can edit any of it.

The sources

If it isn't cited, it's not used.

Any recommendation our AI makes is cited to a source. If it can't find a source, it doesn't make the recommendation.

The check

Grounded in the published guidance.

The library every plan is built from is grounded in 52 HSE publications and approved codes of practice. Reviews are checked against your project's requirements.

Pricing

RAMS software pricing.

Your first RAMS is free, with no card. Plans are monthly, with no contract.

Standard

RAMS and construction phase plans for one person.

£59per month · 1 seat
  • Site-specific RAMS
  • Construction phase plans
  • Project requirements extraction
  • COSHH, noise and vibration assessments
  • 20 documents a month
Draft a RAMS for free
Professional

Writing and review for one person.

£99per month · 1 seat
  • Everything in Standard
  • RAMS review
  • Custom templates
  • Own COSHH sheets from safety data sheets
  • 20 documents a month
Draft a RAMS for free
Principal

Everything, for a team of five.

£199per month · 5 seats
  • Everything in Professional
  • Training register
  • Your existing risk assessments, converted into your library
  • 100 documents a month
Draft a RAMS for free

Larger companies can be billed by active project instead of by user. Request a callback.

No card needed. Full terms.
IT and data

The specs.

DataStored and processed in the UK.
ServersEnterprise-grade hosting located in the UK.
SecurityCyber Essentials Plus certified
AINo customer data is used to train the AI.
Third partiesNo data is given to 3rd parties for their own use.
AccessSAML single sign-on with project-based billing.
InsuranceCyber and professional indemnity insurance.

Questions about RAMS software.

Are AI-written RAMS acceptable?

The law does not say how a RAMS is written. A risk assessment must be suitable and sufficient (Management of Health and Safety at Work Regulations 1999, regulation 3), and the competent person who signs it stays responsible. Every line Ramsgen drafts can be edited before it is issued.

Is there a free RAMS generator?

Your first RAMS on Ramsgen is free: one per account, with no card. Construction phase plans and RAMS review need a plan. The full terms of the free RAMS are on the pricing page.

RAMS software or a RAMS template?

A template is a generic starting point, and a generic RAMS is not a suitable assessment of a specific site. RAMS software drafts the RAMS for the job in front of you, from its documents and its site. RAMS software or RAMS templates sets out the difference.

Draft a site-specific RAMS for free.

No card needed. Full terms.