RAMS and construction phase plans, written for this site.
Create site-specific RAMS and construction phase plans directly from the project requirements, planned in five sections from the scope and documents to the hazards.
Scope and documents
The job's name, what the work is, its size, and the client's documents. Each document is marked as what it is: a construction phase plan, pre-construction information, a drawing or something else. Each is read whole, and the requirements it sets are listed for the rest of the plan. Any section can be reopened and rerun before the RAMS is drafted.
Site
Five questions set the basics: where the work is, when it takes place, who runs the site, how many operatives will be on it, and whether the work could disturb asbestos. Questions about this site follow, written for the job. Any question can be answered “Not sure”. The site postcode finds the nearest A&E.
Sequence
Questions on how the work is done come first. The steps are then drafted from the answers, as main steps with the steps under them. Any line can be edited or removed, and steps can be added.
Site
- Where is the work?Construction site
- When will the work take place?Normal working hours
- Who runs the site?A principal contractor
- How many operatives will be on site?2 or 3
- Could the work disturb asbestos?None expected in what we disturb
Nearest A&E: Southmead Hospital, BS10 5NB · 6.2 miles, 18 minutes
A site-specific RAMS being planned in Ramsgen, with the scope section complete.
Hazards
Hazards are raised from the site and the steps, and a shortlist is recommended for the job, each with the reason it applies. The number recommended follows the job's size. Hazards raised by the client's documents are always recommended. Any other hazard can be added from the library. Each carries a likelihood and impact before controls, which can be changed.
Hazards recommended for this task and site.
Recommended for this job
- Before 15 High
Collapse of excavation
The trench is dug to 1.4 m through made ground.
From: Method
- Before 10 Medium
Strike on the gas main
An asset protection permit is needed within 3 m of the main.
From: Documents
- Before 9 Medium
Members of the public
The footway stays open to the public throughout.
From: Documents
- Before 12 Medium
Hand-arm vibration
The existing surface is broken out by breaker and cut-off saw.
From: Method
Hazards recommended for the job, each with its reason and where it came from.
The RAMS
The RAMS is drafted from the confirmed plan: a risk assessment for each ticked hazard, and a method that follows the steps, with safety notes and hold points where the work must stop for a check. Lines written to meet a client requirement are linked to it, and the markup view shows the requirement and the page it came from.
The nearest A&E
The site postcode is matched against a checked list of 216 24-hour A&E departments across England, Scotland, Wales and Northern Ireland, and the road route to the nearest is worked out with Google Maps. The RAMS prints the hospital, its postcode, the distance by road and the time to medical treatment, with a map of the route and a QR code that opens the directions on a phone.
A department with limited opening hours carries a warning. Where the nearest A&E is more than an hour away by road, the RAMS says to call 999 for any serious injury and to plan for air ambulance. A different hospital can be typed in. A line is left for the supervisor to sign that the route has been checked.
- Hospital Name:
- Southmead Hospital
- Postcode:
- BS10 5NB
- Distance:
- 6.2 miles
- Time to medical treatment:
- 18 minutes
Map data © Google · QR code: directions on a phone
Route checked by ____________________ on ____________
The nearest A&E, as the RAMS prints it.
COSHH, noise and vibration assessments
COSHH assessments, noise and vibration assessments, and the workforce register from the training register are added in the editor and print with the RAMS.
Yours to edit
Edit any line before the document is issued. The competent person signs it off. When you want a finished RAMS checked against the project, that is a review.
RAMS and construction phase plans are on every plan. Every plan is on the pricing page.