For principal contractors

Check every subcontractor RAMS against the pack you issued.

Put your pre-construction information into a project. Every RAMS your supply chain sends for that job is checked against it and against 165 standard review questions. Contractual misses, safety risks and poor practice come back in one highlighted report, cited to the page.

Held to your pre-construction information

Upload the pack you issued to a project and every RAMS that arrives for that job is reviewed against it. The overhead line you told them about is the standard their method statement is measured against.

Each RAMS is also answered against the same 165 review questions in 40 sections, so every submission on every job is checked for the same things.

Finding what isn't there

The hardest thing to spot in a RAMS is what's missing. A method statement that never mentions the overhead line reads the same as one where the line was considered. Because every RAMS is checked against your pack, a hazard it leaves out is reported as missing, with the page of the pack that names it.

What a finding looks like

Each finding says whether a passage is missing, weak or in conflict with a requirement, how serious it is, and which page of the RAMS and of the pack it rests on. You can check it against the document straight away and dismiss the ones you disagree with.

Ramsgen doesn't approve, reject or sign a document. Whether a RAMS is accepted is your decision.

MS-2214 Kerbing, rev CPage 11

6.3 Personal protective equipment. All operatives shall wear hi-vis, safety footwear and helmet within the working area.

Operatives cutting kerbs shall wear disposable FFP2 masks and eye protection. Water suppression to be used where practicable.

6.4 Emergency arrangements. In the event of an incident the supervisor will contact the site office.

Findings
MajorWeakpage 11

Cutting kerb generates respirable crystalline silica. FFP2 has an assigned protection factor of 10; this task needs 20. And “where practicable” leaves the water to the operative on the day.

MajorMissingpage 11

The project requires the emergency plan to name the nearest trauma unit and the route to it. The clause names neither.

Two findings on one page of a submitted method statement.

A record of every check

Each review is saved against the document and the date it was run. If you are asked what was checked, you can show what was found and where.

Your supply chain

There is no subcontractor portal or approval workflow. Documents keep reaching you the way they do now, and Ramsgen does the reading.

Your subcontractors can also use Ramsgen to write their RAMS from the pack you issued.

What it costs

RAMS review is on the Professional plan, £99 a month for 2 seats. Larger companies can be billed by active project instead of by user. Request a callback to arrange it.

Every plan is on the pricing page.

Seven-day free trial · credit card required · Full terms.